Levered Installation Instructions

INSTALLATION INSTRUCTIONS FOR LEVERED TUBS:

Gasket Only Replacement for Levered Overflows:

  • Remove existing trip lever overflow cover and gasket.
  • Take the rubber Ultimate Overflow Gasket and cut a slit at the top of the tube to accommodate the lever. Be sure to do a dry fitting before installing.
  • Place the Ultimate Overflow Gasket into the overflow, followed by the aluminum retaining ring, and overflow cover.
  • Screw all three into your tub using the two screws from your overflow cover.


Levered Overflow Replacement (when removing your levered system)
:

  • Remove existing trip lever overflow cover, gasket, and if you can, the rod, spring, and rocker arm. Save the existing two screws that held your gasket and overflow cover.
  • Place the Ultimate Overflow Gasket into the overflow, followed by the aluminum retaining ring and screw into place using the screws you saved from your old gasket and/or cover.
  • Place the new overflow cover over the retaining ring and gasket and screw cover into the retaining ring with the provided screw.


Levered Drain Replacement
:

  • Remove existing levered drain stopper.
  • Use clear silicone (not included) around the hole in the tub, even using extra if needed.
  • Place the drain replacement into the hole, pressing down to ensure a good seal.
  • Wipe off any extra silicone around the outside of the drain.
  • Let dry for 12-24 hours before using.

 

Levered Drain Image